|
DS Constructions has completed the 27 km long Raipur-Durg expressway project, which is part of NH-6 in Chattisgarh at a cost of Rs 95 crore. The project was awarded by the National Highways Authority of India on a Build-Operate-Transfer basis.
The project involved extending the existing 2-lane carriageway to include 4 lanes.
|
|
|
|
|
| Posted : 6/19/2006 |
|
|
|
|