|
The power Ministry sought the cooperation from power regulators and states to make the
Open access transmission charges reasonable, create a category of short term access for more
Than three months and upgrade and ring fence state load dispatch centre.(SLDC).
The power Ministry held a meeting with power regulators and states for the
Implementation of open access in transmission, especially when the cross subsidy surcharge
Impose by various regulators are quite high. Morever , the methodology adopted by a
Number of state electricity regulatory commissions (SERCs) for determining cross
Subsidy surcharge is different than the methodology in tariff policy.
"A group of six members has been appointing for the accounting of open access . State
Were told to reduce the cross subsidy surcharge , which is a dampener to encourage open
Access in transmission."
The power Ministry brought to the notice of regulators and states that the methology
For the determination of reasonable cross subsidy surcharges has been given in the tariff policy
|
|
|
|
|
| Posted : 2/27/2008 |
|
| Browse through Product Directory of JimTrade.com which offers an exhaustive data on Products of Services where as Suppliers Directory of JimTrade.com provides a detailed information on Suppliers of Services |
|
|
|